Planned before the builders leave
The network for a new office is easiest to get right while the walls are still open. Cabling routes, comms cupboard space, power for access points and where the meeting rooms sit are all decided during the fit-out, and changing them afterwards is slow and expensive. We join the project early, work alongside your builders and electricians, and have the network running before your team moves in.
What we set up
Network. UniFi or Meraki gateways, switches and access points, chosen for your size and how you want to manage it. Speeds from 1Gbps to 10Gbps where the work needs it, with the busy parts of the network kept apart from guest and building traffic.
Wi-Fi. Access points placed from the floor plan, then checked once installed so meeting rooms and the far corners get the same signal as the desks. Our Wi-Fi for business in London guide covers what makes the difference.
Cabling. Cat6A to every desk and access point, fibre between floors, all tested, labelled and documented. We specify it and coordinate the cabling installer as part of the project.
Door access and CCTV. UniFi Access on the doors and UniFi Protect cameras, run from the same system as the network, with access removed when someone leaves.
Storage. For teams working with large files, shared storage on the same network. See our network attached storage page.
Internet. We help choose a business line, deal with the provider on installation, and add a backup connection if the business cannot stop when the main line drops.
How it works
Weeks 1 to 2: Survey and design. We visit the space, look at the fit-out drawings, and write a network design and specification. You buy the kit direct, so it and its warranty are yours.
Weeks 3 to 4: Plan with the trades. Cabling routes, comms cupboard, power and installation dates agreed with your builders and electricians.
Weeks 5 to 8: Install. Cabling first, then the network, Wi-Fi, doors and cameras, each tested as it goes in.
Before move-in. A full check from desks, meeting rooms and the entrance, then a handover document showing what was installed and how it is set up.
For a 20 to 50 person office, six to nine weeks is typical. Talk to us eight to twelve weeks before your move date if you can. If the date is closer, see rapid office deployment.
Why Stabilise
We are London based, with on-site visits across Zones 1 to 3, and we work with fit-out teams and landlords' requirements on London buildings. We specialise in Apple, so the network is set up for Macs from the start: AirPlay in meeting rooms, Macs enrolling over Wi-Fi on day one, and device management that knows which network each Mac is on.
Frequently Asked Questions
When should we involve you? Eight to twelve weeks before move-in, ideally while the fit-out is still being designed.
Can you work with our contractors? Yes. We coordinate with builders, electricians and interior designers so the cabling and comms cupboard are right the first time.
What if we are not sure how many people we will have? We design for your expected headcount in three years, with room to add switches and access points without rewiring.
Do you sell the equipment? No. We specify it, you buy it direct, and we install and configure it.
Is support included after the move? The project includes aftercare after handover, set out in your project document. Ongoing support is available as a managed IT plan.